APA – Coomera Connector Gas Main Relocation

Directional drilling, Road crossing of 250mm steel over 300 metres in rock above 250MPa. DI served as the primary contractor for the Coomera Connector Project on the Gold Coast, conducting drilling operations beneath an important road (Smith Street).

Mitchell Water/Grampians

Directional drilling of multiple road crossings, environmental areas and creeks ranging from 25mm to 450mm in clay and rock conditions, up to 240m in distance.

WESTGATE TUNNEL PROJECT

Installation of 36 under freeway bores for VicRoads ITS networks.
Bores installed up to 10 x PE125mm electrical and communications conduits (700mm cut), up to 160m in basalt rock conditions.

APA

MITCHELL/QGC

NACAP/Beach

NACAP/Arrow Energy